Hi,
As per your suggestion only I ran the data into BPC 1st and ran second time with logic.
found that the data b/w BW and BPC is not matching. BW cube is having Cost center 310000 and cost element 430100 for period 2010001 budget is USD 663,00
but in BPC it showing as 717.1008.
I have selected correct transformation file.
Thanks
Prem